Skip to content
  • Twitter
  • Facebook
  • Twitter
  • Facebook
  • Home
  • About Us
    • About Us
    • Our Board
    • Our Members
    • Our Industry Partners
      • Platinum Partner Wrightsure
      • Platinum Partner Backhouse Jones
      • Platinum Partner Dawsongroup
      • Platinum Partner DH Team
      • Platinum Partner – Ferdia
      • Platinum Partner Ilesbus
      • Silver Partner HGVC Training Services Limited
      • Gold Partner Vectare
      • Gold Partner Volvo
  • UK Coach Rally
  • Help and Advice
  • News
  • Become A Member
  • Member Events
  • Contact
    • [email protected]
    • 0333 7333 222
  • Members
  • Members
  • Members Welcome
    • Association Newsletters
    • Industry Links
    • Responses to Consultations
    • Coach Parking
    • Accounts
  • Coach Hire
Forgot Password?
Join Us
< Back to News

Crisis Control

Crisis Control

If your company, or one of your vehicles, is involved in an incident that is attracting media attention, our Crisis Control service is here to help.  More information can be found here  

Author: Margaret

Administrator and Membership Manager for UK Coach Operators Association since June 2024 View all posts by Margaret

Author MargaretPosted on 5th August 20249th August 2024

Post navigation

Next > Next post: A316 Monday 21 October until mid-2025

News

Closure of Midland Road, NW1 at the junction with Euston Road 1 to 3 August 2025

Contractor’s working on behalf of Thames Water will be carrying out urgent works, these works will be carried out under a road closure. Coaches using St Pancras Coach Park: Please contact Network Rail for alternatives Tour buses: The Pancras Road, Midland Road turning loop will not be available. Please use stops M, D or E … Continue reading “Closure of Midland Road, NW1 at the junction with Euston Road 1 to 3 August 2025”

Construction work on major scheme to transform A23 Streatham Hill to begin in summer 2025

Scheme will create new pedestrian crossings, a protected cycling route and improvements to bus lanes in the area Construction programme planned to minimise disruption for local residents and businesses as much as possible, but there will be impact at times TfL launching a dedicated travel advice page closer to the start of these works.  Roads … Continue reading “Construction work on major scheme to transform A23 Streatham Hill to begin in summer 2025”

Lambeth Bridge – until mid December 2025

During this time there will be no access for vehicles or cyclists over the bridge. Below is detailed information about the closure and traffic arrangements from July – December 2025. Next stage of works : 28th July– 15th December Vehicles Vehicles will continue to travel northbound/westbound only from Lambeth to Westminster. Those travelling from Westminster … Continue reading “Lambeth Bridge – until mid December 2025”

Works on Park Lane northbound: 19 May to 18 Sep 2025

Phase 3: Car Park down ramp approach NOE CE25-66397 – 21 July to 25 July 2025 Bus lane closed past this location Phase 4: Tour stands MT – between Grosvenor and Brooke gates NOE CE25-66398A – 24 July to 16 August 2025 Tour stands closed (no alternative can be provided) Bus lane closed past this … Continue reading “Works on Park Lane northbound: 19 May to 18 Sep 2025”

Week of overnight M2, A249 and A2 closures in Kent during July 2025

Full details have been confirmed for the overnight road closures that will impact travel on Kent’s motorways and major A-roads this week. Stretches of the A2, M2, A249 and A21 will shut at various points throughout the week for different planned works. This includes a series of closures of the A249 Sittingbourne Road between Stockbury … Continue reading “Week of overnight M2, A249 and A2 closures in Kent during July 2025”

Park Lane – coach disembarkation on northbound carriageway – Reminder

Coaches unloading passengers in the northbound coach parking on Park Lane. Please can we remind operators that aside from the two coach bays to the rear of Apsley House no boarding or alighting is permitted in the northbound coach parking due to the proximity of the cycle lane. Additionally all northbound stops have a local … Continue reading “Park Lane – coach disembarkation on northbound carriageway – Reminder”

  • Home
  • About Us
  • Contact
  • News
  • Help and Advice
  • Become A Member
  • Member Login
  • Our Industry Partners
  • Our Members
  • Our Board

UKCOA
Little Owl Farm
Halebourne Lane
Chobham
Surrey GU24 8SL
Tel: 0333 7333 222

© Copyright UKCOA 2025